Multiple daily one lane closures controlled by Flaggers and UTO’s. Temporary speed reduction will be in place reducing the 50 MPH zones to
Source: Twitter vt511
Multiple daily one lane closures controlled by Flaggers and UTO’s. Temporary speed reduction will be in place reducing the 50 MPH zones to
Source: Twitter vt511
UPDATE: VT105 in Sheldon has been cleared.
Source: Twitter vt511
VT105 is experiencing delays in the area of Woods Hill Rd due to a multiple car motor vehicle accident. Motorists should expect delays in the area, or seek alternate routes. Please drive carefully.
Source: Twitter vt511
UPDATE: I89 NB X16(Colchester) ON RAMP has been reopened. Drive carefully.
Source: Twitter vt511
The northbound on-ramp to Interstate 89 at Exit 16(Colchester) is currently CLOSED. This is the ramp to get on the Interstate from Roosevelt Highway in Colchester. Updates will be provided when available. Please drive carefully.
Source: Twitter vt511
VT ROUTE 9 in Woodford is now open to the normal flow of traffic.
Source: Twitter vt511
Wednesday 4/29 motorists can anticipate a temporary reduction to one lane of travel along I-91 Northbound in the vicinity approx, 1 mile north of exit 9 in Hartland. Due to construction.
Source: Twitter vt511
Construction preparation of bridge replacement is now underway on Depot Road over I-91 in Hartland. The traveling public can expect a possible one lane alternating traffic pattern with flaggers on Depot Road once clearing and erosion control measures commence.
Source: Twitter vt511
VT 9 at the ‘Rock Cut’ in Woodford is CLOSED due to a tractor trailer crash for an undetermined amount of time. Specific details are not yet available, updates will be provided as appropriate. Motorists should expect delays in the area.
Source: Twitter vt511
Starting today 4/28/20 Survey work on (4) bridges at the location of I-89 exit 7 in Berlin. In each NB & SB high speed lanes of travel will be closed reducing traffic to one lane. Minor delays.
Source: Twitter vt511