Good Morning, Today District 8 will be performing a rolling roadblock on I-89 between Exits 17 and 18 in both the North and South Bound lanes to remove snow stack from the center of the Lamoile River Bridge between 9AM and 2PM

Good Morning,

Today District 8 will be performing a rolling roadblock on I-89 between Exits 17 and 18 in both the North and South Bound lanes to remove snow stack from the center of the Lamoile River Bridge between 9AM and 2PM

Source: Twitter vt511