Starting today 4/28/20 Survey work on (4) bridges at the location of I-89 exit 7 in Berlin. In each NB & SB high speed lanes of travel will be closed reducing traffic to one lane. Minor delays.

Starting today 4/28/20 Survey work on (4) bridges at the location of I-89 exit 7 in Berlin. In each NB & SB high speed lanes of travel will be closed reducing traffic to one lane. Minor delays.

Source: Twitter vt511